NORTIA LTD · LONDON
SYSTEM WEB · 1970.01
◉ ACCEPTING WORK

Control the process.
Own the outcome.

Nortia designs and commissions industrial control systems for British manufacturing. We operate at the granularity of actual assets, not generic solutions.

DETERMINISTIC INTEGRATION

Formal systems.
Predictable outcomes.

We design PLC and control logic as formal systems, rather than ad hoc ladder patchwork. No hidden complexity. No single-point failures in your automation stack.

01 PLC RUNNING

Industrial Control

Explicit failure modes and verified states. We tune loops and validate against the spec to ensure determinism.

  • I/O Mapping VALIDATED
  • Failure Modes EXPLICIT
02 SOFTWARE IDLE

Asset Granularity

Bespoke applications that solve specific operational problems without the bloat. Built to be maintained.

  • Database POSTGRES
  • Bridges OPC UA
03 WORKFLOW ERROR

Business Automation

Office and back-office workflows that cost you hours every week. We map, automate, and document them.

  • Process Audit MAPPED
  • Runbooks SUPPLIED
ENGINEERED ACCOUNTABILITY

We sign our name to performance,
not to a Gantt chart.

◉ ARTIFACT [LOCKED]
Commissioning Reports. We refuse to disappear after FAT. Handovers include full source documentation.
◉ ARTIFACT [TRACKED]
Deviation Logs. Every variation from standard operation is mapped and provided as a hard baseline.
◉ ARTIFACT [VERIFIED]
Post-Startup Baselines. 12-month warranty. We baseline actual asset throughput.
◉ STATE [SECURE]
IP-respectful. Your processes and competitive edge don't leave the control room.
NO-THEATRE COMMISSIONING

Time in the field.
Not in slides.

◉ 01 · DEFINITION

Brutal Specificity

We write specifications based on measurable states on the factory floor, rejecting generic vendor optics.

Deliverable: Metric-Tied Spec
◉ 02 · STAGING

Logic Verification

Formal simulation of all failure modes. The system is bench-tested rigorously before it ever touches your line.

Deliverable: Simulator Log
◉ 03 · COMMISSIONING

Live Tests

Acceptance criteria is tied entirely to measurable throughput, never generic project milestones.

Deliverable: Throughput Baseline
◉ 04 · SIGN-OFF

If Nortia signs, it runs.

Source, P&ID, and the definitive runbook. The system survives the engineer who built it.

Deliverable: Handover Pack
ENGAGEMENT

Tell us about the process.

DATA PROTECTION: By submitting this form, you consent to the processing of your details to handle your inquiry. Nortia Ltd complies with UK GDPR regulations and is registered with the Information Commissioner's Office (ICO Reg: ZB615459). We do not share your data with third parties.